rocess introduction of various non-woven fabrics

   Spunlace non-woven fabric: The fiber web is impacted by high-pressure water, and the entanglement of the fibers under the high-pressure action is used to form it, and it has a very good structural strength.

  Heat-bonded non-woven fabric: Reinforcing materials are added to the fiber web, and then the fiber web is heated and molded and then gradually cooled to reinforce it into a heat-sealed non-woven fabric.

   Air-flow non-woven fabric: The irregular fiber material is guided by the airflow of the copper drum, bonded and aggregated on the surface of the net and then reinforced, to form an air-flow non-woven fabric.

  Wet non-woven fabric: Put different fiber materials in water for mixing treatment to form a suspended slurry suspended in water, and then collect these suspended slurry into a web forming machine for processing. Since this molding method is carried out in a wet state, it is called a wet non-woven fabric.


Product Detail

Product Tags

Non Woven Bag Production Line  Double High Quality Spunbonded Non-Woven Fabric Production Line

Process introduction of various non-woven fabrics

Spunlace non-woven fabric: The fiber web is impacted by high-pressure water, and the entanglement of the fibers under the high-pressure action is used to form it, and it has a very good structural strength.

Heat-bonded non-woven fabric: Reinforcing materials are added to the fiber web, and then the fiber web is heated and molded and then gradually cooled to reinforce it into a heat-sealed non-woven fabric.

Air-flow non-woven fabric: The irregular fiber material is guided by the airflow of the copper drum, bonded and aggregated on the surface of the net and then reinforced, to form an air-flow non-woven fabric.

Wet non-woven fabric: Put different fiber materials in water for mixing treatment to form a suspended slurry suspended in water, and then collect these suspended slurry into a web forming machine for processing. Since this molding method is carried out in a wet state, it is called a wet non-woven fabric.

Spunbond non-woven fabric: The fiber polymer is drawn into a series of filaments, and these filaments are spread out to form a net, which is made by various bonding methods such as chemical bonding, mechanical bonding, and thermal bonding. forming.

Non-woven machine installation diagram

纺粘无纺布设备-绕卷机纺粘无纺布设备-喷丝头

Non-woven machine specifications

纺粘无纺布设备-喷丝头 纺粘无纺布设备-2

SS(Prodnct width) 1600mm 2400mm 3200mm
Equipment 29x13x10m 30x14x10m 32x15x10m
Speed 350m/min 350m/min 30m/min
Gram Weighht 10-150g/m2 10-150g/m2 10-150g/m2
Yield(Products according to 20g/M2) 9-10T/Days 13-14T/Days 18-19T/Days

 

ITEM EFFECTIVE WIDTH GSM ANNUAL OUTPUT EMBOSSING PATTERN
S 1600MM 8-200 1500T Diamond, oval, cross and line
S 2400MM 8-200 2400T Diamond, oval, cross and line
S 3200MM 8-200 3000T Diamond, oval, cross and line
SS 1600MM 10-200 2500T Diamond, oval, cross and line
SS 2400MM 10-200 3300T Diamond, oval, cross and line
SS 3200MM 10-200 5000T Diamond, oval, cross and line
SMS 1600MM 15-200 2750T Diamond and oval
SMS 2400MM 15-200 3630T Diamond and oval
SMS 3200MM 15-200 5500T Diamond and oval

Maintenance and maintenance measures of non-woven equipment

纺粘无纺布设备-绕卷机 纺粘无纺布设备-喷丝头

Maintenance and maintenance measures of non-woven equipment

1. Lubricating oil and engine oil should be added regularly to all oil filling points of the equipment. The timely replacement of lubricating oil and engine oil can effectively ensure the smooth operation of the machine and reduce the probability of failure.

2. The parts with tightness requirements should be checked in time every day. If there is a fault or problem, it should be repaired or replaced as soon as possible.

3. The chamber body guard plate of the non-woven equipment should be checked daily, and if it is damaged, it should be replaced in time.

4. The parts of the shot blaster guard plate, blades and impellers, directional sleeves, and blasting wheels must be inspected twice per shift. If any damage is found to the above parts, they must be replaced in time.

5. Electrical systems and transmissions need to be inspected twice a week to ensure the normal operation of the power system and prevent short circuits.

6. Regularly conduct clean and hygienic inspections, check the internal parts of the machine, and find foreign objects and pollution that should be cleaned up in time to avoid clogging in the machine body and affecting operation.